U.S. Water Services Corporation (U.S. Water) completed work in June of 2021 for the Florida Governmental Utility Authority (FGUA) at their Village Water Wastewater Treatment Facility located in Lakeland, Florida. The Village Water wastewater treatment facility is primarily an industrial area that receives very little domestic waste. It services approximately 50 separate buildings, about 60% of these buildings are partitioned off for other smaller businesses. In the early 1990's the original facility was upgraded from .01 million gallons per day (MGD) to a .04 MGD facility and was when the original steel tank was placed. In 2018, U.S. Water was called out several times to patch holes in the tank that ruptured after the hydrogen sulfide started deteriorating the walls. Along with that, the digesters were undersized and structurally unsound for the facility. U.S. Water worked with the FGUA and Jones Edmunds on constructing a new 40,000-gallon surge tank, 30,000-gallon digester, independent digest blower-air header, modular office, electrical equipment, and instrumentation. Wastewater treatment is a challenge due to the large swing of Carbonaceous Biochemical Oxygen Demand (CBOD) entering the facility. With the higher levels, it was necessary to build a larger than average digester to handle the increased sludge production from the facility. Before building the surge tank and digester, staff redesigned the aeration blowers and diffusers to help address the high levels of CBOD that at times were upwards of 1,200 mg/l. Typical domestic CBOD ranges from around 200 to 250 mg/l, so it became necessary to have enough air to handle the incoming waste and an efficient method of oxygen transfer. U.S. Water dealt with some difficulties and equipment delays due to the ongoing COVID-19 challenges, extending the project longer than expected. However, the project was successful and came in under budget.
U.S. Water Services Corporation (U.S. Water) completed work in June of 2021 for the Florida Governmental Utility Authority (FGUA) at their Village Water Wastewater Treatment Facility located in Lakeland, Florida. The Village Water wastewater......[Read More]
The City of Inverness, who piggybacks the City of Crystal River Contract, has also decided to adopt the contract extension and continue services. The "piggybacking" of existing government bid contracts enables our government clients to partner with......[Read More]
The City of Crystal River renewed the first of two contract extension options for another three years through September 2024, in which U.S. Water Services Corporation (U.S. Water) will continue providing operations, maintenance, and management......[Read More]
On September 15th, U.S. Water Services Corporation Region Three put on the second annual Employee Appreciation Day luncheon with 30+ employees in attendance. We were able to clear out the large covered carport in the backfield of the Lehigh Acres......[Read More]
The MVP (Most Valuable Process test) for wastewater process control is the 30-minute settleability test. This article will highlight the usefulness of this simple, easy and cheap test and explain how to execute a set test properly and what the test......[Read More]
U.S. Water will be starting the fourth and final Colonial Manor Water Main Replacement project in July. The work includes replacing approximately 8,590 linear feet of water main in the Colonial Manor development. The replacement of water mains......[Read More]
Mr. Travis Pender, Utility Manager in Fort Dodge, Iowa, was a guest speaker at Fort Dodge Middle School. He talked to the students about the water and wastewater process in Fort Dodge—What happens to dirty water, where the water comes from, the......[Read More]
U.S. Water recently completed a well replacement at the Highlands Mobile Home Park after the existing well collapsed, leaving the well at limited capabilities with poor water quality. U.S. Water installed a smaller well pump to provide potable water......[Read More]
U.S. Water was recently contracted to perform sand filter rehabilitation on all four sand filters at the South County Advanced Wastewater Treatment Plant in Hillsborough County. The County started finding issues with the filters, needing to perform......[Read More]